Mechanical Project Manager - Data Center Construction

Turner Townsend

Newark, New Jersey, United States Posted November 11, 2026

Check how well your resume matches this job

On-site Full-time Mid level
Job Description

Turner & Townsend is looking for a Mechanical Project Manager to work with our team, and partner with a global manufacturing client.  

The ideal candidate will have an engineering background with strong Mechanical or MEP knowledge and experience. To be successful in this role, you will be consultant minded and have experience with Owner’s Representation.  

Responsibilities:  

  • Manage applicable engineering drawings, specifications, and documents.  
  • Effectively communicate with external and internal team members and stakeholders at all projects stages.  
  • Support the scheduler with updates on progress.  
  • Support field coordination between the General Contractor, Commissioning Agent, and Client.  
  • Undertake field walks with the General Contractor and Sub-Contractor Trades.  
  • Attending field and punch walks with the architect and MEP Engineering team.  
  • Help support and manage project close out documentation.  
  • Ensure QA/QC is being followed and report any issues/gaps.  
  • Perform quality review of technical documentation for accuracy and contract compliance.  
  • Perform engineering quality assurance and engineering quality control reviews for all design drawings, prior to submission to Construction for builds.  
  • Prepare scheduled and ad hoc reports on the project’s progress, Key Performance Indicators (KPI), and progress tracking.  
  • Managing the flow of project information between the team and the client, through regular meetings and written communications.  
  • Knowledge management – Ensuring that key information and learning generated from each commission is inputted into internal databases and shared.  
  • Identifying and ensuring that the client and management are aware of quality, safety, health and environmental issues.  
Required Skills
project management manufacturing quality assurance compliance KPIs communication
How to apply

You apply on Turner Townsend’s own careers site. No account needed.

Apply on company site
How well do you match?

Upload your resume and ARes scores it against this job in a few seconds. No account needed.

Your resume is read to calculate the match and then deleted. Nothing is saved.

Already have access? Sign in
About Turner Townsend

See every open role at Turner Townsend on ARes.

More Jobs at Turner Townsend
Share This Job