Electrical Project Manager - Data Center Construction

Turner Townsend

Lubbock, Texas, United States Posted November 10, 2026

Check how well your resume matches this job

On-site Full-time Mid level
Job Description

Turner & Townsend are seeking an experienced Electrical Project Manager to join our team in support of the Data Center Construction team. The ideal individual will have prior experience supporting large-scale construction projects.


Responsibilities:  

  • Effectively manage, coordinate, and collaborate with project stakeholders. 
  • Effective communication across our internal team to ensure efficiency and a consistent delivery to the client.  
  • Analyze, track, and effectively manage critical milestone activities (such as switchgear delivery, factory testing, and system energization) to avoid schedule slip. 
  • Verify that effective project governance, rigorous QA/QC processes, pre-commissioning checklists, and specialized systems are utilized. 
  • Ensure application of industry best practices, testing standards (such as NETA or IEEE), and safety protocols on all electrical projects. 
  • Production of formal project status reports and other reports as required.  
  • Monitor the progress of multiple construction projects simultaneously to ensure that the approved electrical design standards, single-line diagrams, and local/national electrical codes are being applied correctly. 
  • Manage the interface and delivery timelines between all equipment suppliers (e.g., transformers, UPS systems, switchgear) through monthly trackers and weekly technical reviews. 
  • Manage the flow of project information between the project team through regular meetings and written communications.  
  • Forecast, track, and update key project milestones, critical path items, and testing phases. 
  • Manage and monitor local design teams in accordance with commission criteria.  
  • Provide technical support to owners, architects, general contractors and regional stakeholders.  
  • Review of submittals and RFIs 
  • Client management – assist in developing excellent working relationships with Clients, with a view towards maximizing new opportunities.  
  • Strategic Thinking - provides advice to project teams on approaches that can be adopted to successfully achieve both clients’ objectives and business objectives.  
  • Knowledge management – ensure that key information and learnings generated from each project is captured.  
  • Process improvement – Identify ways to improve internal systems, pre-functional checklists, and QA/QC procedures. 
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.  
Required Skills
project management collaboration communication testing quality assurance Hugging Face technical support process improvement SOX
How to apply

You apply on Turner Townsend’s own careers site. No account needed.

Apply on company site
How well do you match?

Upload your resume and ARes scores it against this job in a few seconds. No account needed.

Your resume is read to calculate the match and then deleted. Nothing is saved.

Already have access? Sign in
About Turner Townsend

See every open role at Turner Townsend on ARes.

More Jobs at Turner Townsend
Share This Job