Design Project Manager - Data Center Construction

Turner Townsend

USA wide, United States Posted November 5, 2026

Check how well your resume matches this job

On-site Full-time Mid level
Job Description

Turner & Townsend is seeking a Design Project Manager to work with our team, and partner with our client, supporting designs for new and existing construction builds.  

The Design Project Manager should have an architectural background in the construction industry and be experienced in Design/Architecture/Civil works.  

Responsibilities  

  • Provides support and reports to the assigned Project Manager(s) or Project Director.  Position has frequent interaction with the Owner/Client, consultants, design professionals and contractors.  
  • Directly assist the Project Manager(s) in managing, coordinating and administering the project through all phases of design and construction.  
  • Responsible for ensuring all aspects of client services are delivered at the highest level to ensure the client’s needs are addressed.  
  • Aids in the preparation of documents (reports, schedules, invoices, RFI’s, submittals, meeting minutes/agendas, daily reports, change orders, inspections, closeout and client presentations) for programming, design and construction and will assist in maintaining information in project management software.  
  • Coordinate to schedule meetings with the project team as directed by the Project Manager(s).  
  • Communicate conceptual designs and create/maintain project documentation before, during, and after construction.  
  • Maintenance of Basis of Design, prototype design, and template specifications for architectural elements.  
  • Review and inform design RFPs.  
  • Manage our external design consultants through the design and construction process.  
  • Effectively communicate design standards to internal and external project partners.  
  • Manage multiple fast paced projects simultaneously.  
  • Think outside of the box to find innovative solutions prior to and during the construction process to reduce costs without negative impacts on quality or reliability.  
Required Skills
project management customer service
How to apply

You apply on Turner Townsend’s own careers site. No account needed.

Apply on company site
How well do you match?

Upload your resume and ARes scores it against this job in a few seconds. No account needed.

Your resume is read to calculate the match and then deleted. Nothing is saved.

Already have access? Sign in
About Turner Townsend

See every open role at Turner Townsend on ARes.

More Jobs at Turner Townsend
Share This Job